Skip to main content

Output: Adjusting Andamio/Edify Platform Based on Feedback

Criterion: refining the platform based on user input. Evidence required: platform feedback tracking report.

Sessions ran 7, 14 and 17 October 2026 with the first cohort. Six changes were made to our own side of the programme, items 1 to 3 from session 1 and 4 to 6 from session 2. Session 3's feedback was about the Andamio platform rather than our delivery and is tracked in Andamio platform enhancement requests.

ObservedChangedVerify
1The public course reference was linked only from under the module list, so learners arriving anywhere else could not reach itCourse docs link in the footer of every page, with acceptance criterion ISC-17 and an automated probe asserting it on three pagesCommit 2e99c29, deployed 8 October 2026, live on edifysystemsgroup.com. ISC-17
2Session 1 was not recorded, though the deck promised recordings, because the call ran on a personal account with recording started by handSessions moved to a recurring Edify-side meeting with cloud recording and transcription set on the meeting itself. A written recap published for session 1Session 1 recap, 8 October 2026. Sessions 2 and 3 recorded without host setup; session 3 recording
3Cohort members joined the Discord and did nothing: no welcome, no introduction prompt, and the channel sat in a public categoryCohort category restricted to the cohort role, pinned welcome, structured introduction prompt, announcements channel read-onlyDiscord server Edify Impact V2, #dev-accelerator. Restricted to cohort members, so attested
4Two of fourteen learners joined session 2. The delivery partner, who recruited eleven of them, had sent no reminders and reported WhatsApp as his community's actual channelCohort coordination moved to WhatsApp under the delivery partner, who runs promotion and reminders. Discord kept as support and record channel. Newsletter before each call. Session 2 deferred and re-run at session 3Session 2 recap, session 3 recap. Mailing list tag deva_cohort_f11, fourteen members
5Neither learner on session 2 had minted an access token a week after being told to. The blocker was holding ADA, not the instructionADA sent to any learner who supplies a receive address, so the platform fee is not funded up frontAccess token cost and refund
6The recorded minting walkthrough did not capture the wallet signing dialog, the step a first-timer stalls onWalkthrough re-recorded with the signing screen and posted to the cohort channel#dev-accelerator in the cohort Discord. Restricted to cohort members, so attested

How feedback is collected and tracked​

In sessionquestions and objections raised live, captured in the session summary
Between sessionsWhatsApp, run by the delivery partner, with #dev-accelerator in the cohort Discord as the support and record channel
Before each sessioncohort newsletter to the deva_cohort_f11 mailing list
From the materialeach group reports on the modules it is assigned, so all nine are covered between the three groups
Written, oncecohort feedback form, issued 24 October 2026. Seven open questions, with a consent item setting whether an answer may be quoted. Nine of fourteen responded; findings in the cohort feedback report. Individual responses are not published

Outstanding​

  • The groups' own reports on the modules they were assigned.

The cohort feedback report and the improvements and action plan are complete.