Skip to main content

Output I: Integration with the Andamio team

Approved output (milestone preamble). "Edify and Dcypher will work directly with the Andamio team to create the structure and integrate the content into the Andamio PBL platform." Evidence required. Record of the collaboration.

Change of delivery partner​

The work this milestone describes as DCypher's was carried out by Fluid7 working directly with the Andamio team. Full account: project overview.

Counterparties​

Andamio is built by Gimbalabs. James Dunseith, founder; Harsha, long-standing contributor.

Scope agreed with Andamio​

Written services proposal, Andamio services for Edify Business Accelerator proposal, mapping their Pro Package to named deliverables at US$18,000 (≈₳49,750 at the rate they quoted): PBL train-the-trainer workshop, CIP-68 on-chain assets, a skill-tracking validator recording learning-target completion on-chain, an implemented treasury, and deployment of an Edify-Andamio instance. Attached to the Milestone 2 submission; it carries commercial terms and is not published here.

Migration and content integration, Aug-Sep 2026​

Andamio moved v1 to v2 during the project. The v1 courses were never on-chain and could not be carried across. Working with James Dunseith, the v1 course was recovered as an export bundle and rebuilt against the v2 model. Course created on mainnet: policy 0d597fc9606dcc2dbe2b4ad355fe5d2b84d748a9389ae262a85c354c, tx ae6ae7039810b4c16beb8c41fbf1c50842d6fd8f8b8fe4b1a9c36137f7d718e6.

Edify's Course Planner is the single source of truth. A pipeline exports it, resolves each linked presentation, extracts slides, speaker notes and images, renders diagrams drawn as grouped shapes, scaffolds one file per course element, converts to the Andamio import format and imports each module with its figures.

Imported 24 September 2026: nine modules, all DRAFT, with lessons, nine assignments and 309 figures on the Andamio CDN.

Defects found and reported to Andamio​

DefectEffect
Access-token aliases are not sanitisedan alias minted with a trailing space never resolves; one Edify team member is locked out and must re-mint. Reported Sep 2026.
CLI reports a dead session as activethe 24-hour token's expiry presents as an unexplained authorisation failure.
Lesson and learning-target counts must match on importmore lessons than targets is rejected; fewer silently preserves the rest. Documented so structure is correct before minting freezes it.

Split of work​

EdifyCourse design, module and lesson structure, learning targets, all source content and presentations, assignment design.
Fluid7Planner-to-Andamio pipeline, content conversion and import, figure extraction and upload, course site and Playbook Builder, public documentation site, platform liaison.
Andamio / GimbalabsThe platform, v1-to-v2 migration support, services per their proposal.